Carcross Footbridge Construction, 2007 July 16 - construction of the temporary bridge on the south side continues, and the initial pour of concrete for the footings has been made.
Carcross Footbridge Construction, 2007
July 16 - construction of the temporary bridge on the south side continues, and the initial pour of concrete for the footings has been made.
This photograph is © 2007-2018 by Murray Lundberg, and is not to be copied without express permission.